Shaoyang Drowning Prevention Base
- Introduction
Introduction
Project Name: Commercial Pools
Pool Type: Anti-Drowning Training Pool
Pool Size: 25 m × 19.8 m × 1.2 m
Construction Period: 15 Days
Completion Year: 2022
Project Overview:
Located within a youth sports complex themed around swimming and drowning prevention, this project represents China’s first sports center dedicated specifically to anti-drowning education and training.
The 25 m × 19.8 m modular pool was constructed in just 15 days using a prefabricated structural system that ensured rapid installation without compromising long-term stability.
Designed as the region’s first professional youth swimming training base, the facility aims to advance water safety awareness and develop essential swimming skills among children and teenagers.


