Gaoming No.1 Middle School Modular Swimming Pool
- Introduction
Introduction
Project Name: Commercial Pools
Pool Type: School Training Pool
Pool Size: 25 m × 7.5 m × 1.2 m
Construction Period: 10 Days
Completion Year: 2022
Project Description:
This project was built for Gaoming No. 1 Middle School as part of its physical education enhancement plan.
The modular swimming pool—measuring 25 m × 7.5 m × 1.2 m—was completed in just 10 days, providing students with a standardized facility for swimming training and water safety education.



