Yinghui Prefabricated intelligent (competition) swimming pool
- Introduction
Introduction
1、Yinghui Introduction
Guangdong Lokang Sports Technology Co.,Ltd was established in 2010. It is a high-tech enterprise focus on designing, producing and selling sports facilities. Construction of Drowning Prevention Safety System, Modular Smart Natatorium, Modular Smart Swimming Pool. The company's "Yinghui" brand is well-known all over the world, and its products are exported to more than 100 countries.
-

Headquarter in Shunde
-

Hong Kong Branch
-

Beijing R&D Center
2、Design Standards
Dimension: competition pool 50*25*2m; training pool 25*20*2m Basis
"International Swimming Federation FINA Standard Manual" FLNA2009-2013
"Code for Design of Water Supply and Drainage for Buildings" GB50015-2003 (2009 edition)
"Technical Regulations for Water Supply and Drainage Engineering of Swimming Pools" CJJ122-2017
"National Standard Design Atlas - Swimming Pool Accessories Installation and Equipment Selection Atlas04S107"
"National Standard Design Atlas - Waterproof Casing Atlas 02S404"
"Water Quality Standards for Swimming Pools" GB37488-2019 (New National Standard)
"Code for Construction and Acceptance of Water Supply and Sewerage Pipeline Engineering" GN50278-2008
Standard competition swimming pool graphic design (50*25*2m)

Training swimming pool graphic design(25*20*2m)

50m standard competition pool design renderings

Product comparison
| Other swimming pool brand | Yinghui Prefabricated intelligent (competition) swimming pool | |
| Material | Galvanized steel | ZAM aluminum magnesium zinc steel plate |
| Warranty | Pool body warranty for 10 years | The pool body is guaranteed for 15 years and the service life is 50 years |
| Construction period | 90days(50*25m competition pool) | 30days(50*25m competition pool) |
| Pool structure design | Ordinary inclined support structure, need to rely on platform stability | self-stabilizing technologyThe deeper the water, the more stable it is |
| Energy saving design | None | 5 sides heat preservation + solar energy + air energy, low energy consumption |
| Water management | Ordinary countercurrent circulation, large amount of chlorine disinfectant | Low chlorine countercurrent circulation system, greatly reducing drug delivery |
| Smart System | None (completely manual) | One-key unmanned management mode of swimming pool intelligent system |
| Anti-drowning | None | Anti-drowning early warning + safety management system real-time monitoring |
| Installation and maintenance | Difficult to install and replace parts | Low technical threshold for bolt assembly and installation, easy maintenance |

Pool Type: Competition Training Pool
Pool Size: 25m X 20m x 2.2m
Construction Period:30 Days
Completion Year:2022
Project Description:
This project was built for the Beijing 2022 Winter Olympics National Training Base, serving as a professional competition-standard training pool for athletes.
The pool adopts Yinghui’s modular stainless-steel system, featuring precise installation, excellent stability, and superior water circulation performance.
Despite tight timelines and winter construction challenges, the project was completed within 30 days, providing a world-class training environment that meets international competition standards.

Pool Type :Competition & Children’s Pool
Pool Size:Competition Pool:50m X 25m x 1.5m
Children’s Pool: 25m X 10m x 1.2m
Construction Period :25days
Completion Year:2019
Project Description:
The ACE International Sports Center project features a modular, eco-friendly, and intelligent pool system that requires no civil construction or welding.
The pool structure is fully bolted and reusable, with a three-way water circulation system (surface, mid-level, and bottom return) and five-sided thermal insulation design to ensure efficient energy use and stable water quality.
The project aims to create the largest swimming and fitness complex in Foshan, as well as the city’s first professional youth drowning prevention training base, promoting public swimming education and water safety awareness.

Pool Type:Commercial Leisure Pool
Pool Size : 25m X 20m x 1.5m
25m x 15m X 1.5m
Construction Period:25 Days
Completion Year:2020
Project Description:
This project consists of two modular swimming pools built on the rooftop of a hotel in Wenshan,Yunnan Province.
The pools adopt Yinghui’s prefabricated steel structure and waterproof liner system, ensuring fast installation, lightweight construction, and long-term durability.
Despite complex rooftop conditions, both pools were completed within 25 days, providing guests with a relaxing leisure experience and setting a benchmark for modular rooftop pool construction in Southwest China.

